Host Kevin O'Connor arrives to find exterior coatings specialist
Dan Rourke and his crew applying the EIFS finish coat. Custom pool
specialist Bob Snay installs a black pebble finish on the bed of
the new water feature. Inside, general contractor Tom Silva
oversees the installation of the steel stairs. Kevin visits the
custom metal shop that fabricated the steel as well as the dramatic
bronze "wishbone" balustrade that will be installed later on the
job. Reclaimed wood specialist Richard McFarland shows Kevin
samples of reclaimed wood from all over the world as Tom's crew
installs exterior redwood siding harvested from giant olive casks.
Plumbing and heating expert Richard Trethewey gives Kevin an update
on the mechanicals - the new boiler has arrived, radiant panels are
installed underneath the first floor and PEX water supply lines
have been run.