Loading descriptions...
East Boston Project (Part 12 of 18)
The 90-year-old slate roof could not be saved, so roofing
contractor Sean Green and his crew strip off the old slate and lay
down new asphalt the proper way. General contractor Tom Silva shows
host Kevin O'Connor how his crew is hanging 5/8 fire-rated
wallboard on the ceiling with the help of a handy wallboard hanger.
In the second floor bathroom, plumbing and heating expert Richard
Trethewey installs a new custom copper shower pan and drain. In the
basement, master electrician Allen Gallant shows homeowner Chris
Flynn the new, updated service panels and the new external whole
house surge suppression system that will protect all the household
appliances and electronics from power surges and lightning strikes.
Kevin lends Tom and Richard a hand getting the cast iron tub into
homeowner Liz Bagley's first floor bathroom. (Part 12 of 18)