Loading descriptions...
East Boston Project (Part 14 of 18)
While homeowner Liz Bagley works to strip paint off the front door
trim, general contractor Tom Silva creates a wood inlay to patch
her kitchen floor with material salvaged from other parts of the
house. Plumbing and heating expert Richard Trethewey shows host
Kevin O'Connor the progress in the basement, and the anatomy of the
new boiler for the first floor unit. Kevin visits Boston Symphony
Hall to see how they are using custom milled maple and steel cut
nails to replace the 100-year-old original stage floor, without
altering the renowned acoustics of the hall. In the second-floor
bathroom, Tom shows Kevin how he's milling up custom PVC mouldings
to trim out a window that is in a shower well, and therefore
vulnerable to water damage. (Part 14 of 18)